Old Mill 2

Shuttering

Shuttering for water channel

The reason this is such an exciting picture for us at BWCE is that is it means the construction of our waterwheel is moving on apace. This is a picture of the shuttering that went into the bottom of the channel the water will course through to turn our water wheel. Shuttering, for those of you who don’t know, is the wooden structure that is used as a temporary former to contain setting concrete. In this case the shuttering went into the bottom of the channel, the concrete was poured and when it has set hard the shuttering will be taken out and we should have a nice curved channel that will exactly fit the diameter of the water wheel.

Water channel under construction
Water channel with workers

 

Workers constructing the channel

 

 

 

Water channel nearly ready for shuttering

 

 

 

Meanwhile in Germany at the Hydrowatt factory the wheel is being built – photo’s to follow.

Comments are closed.